• Home/ Hem
  • History/ Historia
  • Inspections
    • Photos/ Bilder
  • Operation/Verksamhet
    • Description
  • Contacts/ Kontakt
  • References/ Clients
  • Målningsarbeten
    • Bilder
    • Tjänster inom måleri
  • Häueser & Co GmbH

+46 (0)70 240 87 56 / soren.o.stutin@scc-ab.se

Surface Cladding Consult Storfors AB

  • Home/ Hem
  • History/ Historia
  • Inspections
    • Photos/ Bilder
  • Operation/Verksamhet
    • Description
  • Contacts/ Kontakt
  • References/ Clients
  • Målningsarbeten
    • Bilder
    • Tjänster inom måleri
  • Häueser & Co GmbH
  • More
    • More child

Cracks in coating, installation time 4 years.

Thermal sprayed WTE boiler installation time 2 years, surface intact, test with sandblasting showed that bounding between sprayed layer and tube was lost. Time for blasting 1-2 sec until coating was of.